Building Regulations Drawings / Technical Drawings / Construction Drawings

Detailed drawings ensuring your project meets all safety and legal standards

Our services

Detailed building control drawings ensuring compliance and safety.

Legal Compliance

Plans crafted to meet safety, energy, and structural regulations to get approved from building control

Technical Plans

Precise drawings showing construction methods and material specifications.

brown pencil on white printing paper
brown pencil on white printing paper
scrabble tiles spelling out the word complaints
scrabble tiles spelling out the word complaints
What are building control drawings?

They are detailed plans showing how a project meets legal safety and structural standards.

What details do the drawings include?

They cover construction methods, material specifications, drainage plans, and structural calculations for approval.

How long does the process take?


Timing varies, but typically it takes a couple of weeks after planning permission is granted.

FAQ's

When are these drawings needed?

After planning permission, they ensure your project complies with building regulations before construction.

Who prepares these drawings?

Our Qualified professionals with expertise in building regulations create these detailed plans.

Can I start building without these drawings?

No, construction must wait until building control drawings are approved to meet legal requirements.

Get in touch

white and black dice on green textile
white and black dice on green textile
Services

Expert architectural solutions for your home extensions.

Contact

REGISTERED Address

support@nfaarchitecture.co.uk

07443 234283

© 2025. All rights reserved.

128 City Road, London, EC1V 2NX

📞

PART OF NFA GROUP LTD.

SUTTON OFFICE ADDRESS

Sutton Plaza Sutton Court Road SM1 4FS